Prototype 2 Construction Progress - Piping's Up on 6 October 2010 (Wednesday)






A picture speaks a thousand words; click on image to enlarge.

In summary, the main piping and valve connections are up, less the sight glass as we were short of a 1" x 1/2" Reducer Bushing. The workers used metal and I explained to them that metal can't be used - detrimental to methanogens etc. Hence, I will need to do more purchasing tomorrow. Due to the lack of manpower, me and marcus will work on 2 separate sites:



Kian How - Tuas:
  • Buy 1" x 1/2" PLASTIC Reducer Bushing x1
  • Buy 1" threaded sch 80 End Cap x3
  • Buy 2" threaded sch 80 End Cap x1
  • Buy 2" Hose Ring x1
  • Drill holes on base - to prevent rain water accumulation
  • Supervise construction of bushing for gas sampling port
  • Call Ai Ling (Auric) for Detailed Gas-D Sampling Probe Dimensions

Marcus - SVF:
  • Meet Vacuum Truck at 10.30am
  • Run Orange Digestor
  • Draw out a table of data to record (Temp, pH, age of input waste, etc)
  • Follow up on Totalizer


Auric Gas Detector Sampling Probe - KH to call Auric for dimensions to construct sampling port:




Kian How, signing off on 06/10/10, 9.30 pm

1 comment:

  1. Hi Guys,
    You all should really get the ABE students involved in all these testing. It should be interesting for them to know. Call Aswin.

    ReplyDelete

This blog serves as our FYP logbook. Thank you for visiting.
We welcome all suggestions and comments!!