Friday, October 29, 2010

Grey Digestor Transportation, Loading & Testing between 27-29 October 2010 (Wed - Friday)

 
Almost done with the construction, what's left is getting the end-caps which are out of stocks, an aerobic stage discharge hose, and a 50 cm stand for brenda.

Enough said; as usual, a picture speaks a thousand words:


Drilling more holes at the base worked; no rainwater collected despite the heavy rain:




Transporting the digestor from Ensure:





Transporting the digestor to Singapore Vision Farm:








The close-up of the loaded digestor sight glass





This is how the digestor looked like from the top; if you climb 2 meters:



Let the test analysis begin!
 
  

Will be scouting for the test chemicals for COD, BOD tests and the thermo-reactor on Monday (1st November 2010) after school.

Results of pH Test
Human Waste: 6.9
Water: 9.0

What else?!?! To recalibrate the pH meter!



Kian How, signing off on 29 October 2010, 9.30pm