Things completed today:
  • Fixed PVC part of scrubber
  • Cut all pipes to size
  • Redrilled scrubber
  • Resealed connectors
Photobucket
Marcus and Kian How working on the resealing..


previously, PVC gel was only placed on the outside of the tank connectors.. but we were advised that it will not create a leak-proof situation.. therefore, sealant is now placed between the drum and rubber and well as between rubber and tank connector..


Photobucket
Brenda's sizing pipe down..

as observed here, the pipe sizes came in 2.9m length. therefore, it is necessary to size down all the pipes to dimensions which we need..


adios amigo~~

 