5th July 2010
more purchasing to be done!!!
we've more or less purchased everything already.. like, additional tank connectors or such which we'll need..
we've also settled our capture (initial idea was a piston, then changed to a plastic container[cookie type?] about last week or something, then now changed to just a simple swimming float)..
however, we've yet to settle our racks and from capture to users part as well as scrubber to capture part!!
oh yeah.. we've also removed the flowmeters as it wouldnt register much.. also have abandoned the turbine flow meter for now as it's for large flow and is far too expensive.. impractical for this prototype..
We've also removed the checkvalve between the digester and scrubber ( it would create too much additional pressure drop and is generally pointless).
so.. major changes are:
- removal of checkvalve between scrubber and digester
- change of capture from piston to container to float
- removal of flowmeter
more work to do!!!!
adios amigo~