Trial Loading & Leak Detection (10 August 2010, 2pm - 6pm, SVC Farm)
We are sorry Mr Kon, after fixing the leakage on the Anaerobic Stage (top drum), another leakage occurred at the aerobic stage (bottom drum).
Reason: Base was only sealed with silicon, not contact glue.
Rectified issue & redesigned methane capture.
The cow dung:
Mixing the manure precisely at 12 vol% concentration
- Ratio Method
- Pail Volume = 18 L
- 5cm height of cow dung, top up to 25cm of water =20% conc
- Do it for 2 rounds = 21L for Loading into Anaerobic stage (top blue drum),
i.e. 70% solid : 30% headspace
Unfortunately, after loading, there was a MAJOR LEAK at the base of the bottom drum.
Reason: Did not seal bottom with contact glue; how did this get past us?
See below: No yellow colour means no contact glue
Did a leak test with top drum and no leakage detected:
Contact glue (yellow) + another layer of silicon (white) = double protection; see below
Result = no water leakage
Air-tightness: yet to know until next run
Next Tasks:
- Seal Stirrer with 1" N-cap for Air-Tightness
- Buy N-cap and 1"pipe
- Buy O-ring and burner tip for methane capture
- Buy small pail and scoop to increase loading rate
- Buy saw blades to saw (2)
- Brenda to follow up on gas Detectors
- Commission and run digestor with methane capture system
Kian How
Signing off on 13 August, 2.20 am
No comments:
Post a Comment