25th June 2010
so.. today, we only drilled the holes into the two drums and attempt to cut the rubber..
our initial drums, one for aerobic stage and one for anaerobic stage
aerobic body before cutting
anaerobic top before cutting
Denise discussing with us and organising our work for the day
thinking....
spotted the camera.. lol.. with Denise's hand..
Scrubber after drilling
Anaerobic after drilling
Valve rings to help connect the pipes to the drums as suggested by Duran (i think).
erm.. the grey part of the 'gun' is the valve socket to connect the 1" globe valve (black part) to the other pipings.. on the table are 2 x 2" ball valves (it's really huge), 1 x 2" valve ring, a 1" elbow and another valve socket
as seen, the 3/4" ball valves at the ends of the 'guns', the 1" valve sockets and 1" elbows
Marcus sizing the rubber seals for the valve ring
Marcus sizing the rubber seal under Denise's supervision
Kian How cutting the rubber seals for the valve rings
Denise cutting the rubber seals for the valve ring
Melted previous prototype..
amused by second level door
PFD as of 25th June 2010 inclusive of dimensions. for PDF file, please refer to Brenda
All in all, summary of what was done are:
- Purchased 2 more drums from Taiko
- Drilled drums
- Updated PFD
- Cut rubber for seal
adios amigo~~